GPS application in the mearing of bridge and road construction

GPS is developing in a very rapid way and now isfeatures of GPS (RTK): short observing time, high
widely used in many fields. You may get to knowprecision and high speed of offering the
the GPS GSM tracking. It also plays an importantcoordinate. In the GPS positioning, it appears
role in the road and bridge building. It has fullysimpler, more convenient, faster and more reliable.
changed the used measuring method. It servesWith the progress of the science and technology,
the people in a better way. We will discuss thethe GPS tends to be with technology, network,
GPS application in the construction.integration and intelligentization. It will offer people
The principle of GPS levelingmore effeciency and convenience.
If the users have the device which can receive,GPS shows better performance than the
track, change and measure the GPS signal, theyElectronic Total Station. The total station is the
can conduct the navigating measurement with thethree-demensional measuring system composed
GPS signal. People classify it according to theof electric measurement, electronic distance
principle and function. The one is the staticmeasurement and data storage cell. It can
positioning. It means that the GPS receiver isautomatically display the measuring result, and can
involed in the static measuring on each flow stand.exchange the information with the peripheral
It's static in the capturing and tracking the GPSequipments.
satellite.Because the equipment can realize the system
In the observing process, the receiver receivesintegration perfectly, people usually name it the
the simultaneous observation data from thetotal station electronic tacheometer. Compared
standard station and satellite. The receiverwith it, GPS is more powerful. It doesn't cost
measures the spreading time of GPS signal withmuch manpower and material. It features with
high precision. It will calculate the three-dimensionalhigh precision, low cost, snap action, interference
coordinate of the users according to the GPSrejection and high reliability.
satellite location.You can complete the measuring of the area with
The other one is the kenamatic positioning. Thea radius of 15 kilometers by setting one station.
GPS receiver measures the running orbit of aMuch time is saved compared with the tradional
running object. The initialization work should bemethod. One people can do the observing and get
done before the measurements. Then the flowthe three-dimensional coordinate.
stand will do the observing automaically accordingAll in all, the GPS technology will be maturer and
to the scheduled sample interval. The location ofmaturer with the constant progress of the
the sample point will be fixed with thescience and technology. Some shortages existed
simutaneous observing data of the base station.at present will be made up in the future work. In
The GPS positioning technology is widely used inthe future bridge and road construction, it will
the fields of the engineering survey. The Realbetter serve people and bring benefits to the all
Time Kinematic makes the technology possible tohumanity.
be used in the engineering measuring. The